The construction system was conceived as a series of ‘families’ that corresponded to both material processes and systems as well as construction sequencing on-site.
Within each family, individual components were fabricated by third parties or prepared in-house at a shop facility. When brought to the site, only hand tools, screws, and bolts were necessary for a rapid six week assembly process.